1. Home
  2. /
  3. New Construction in Emeryville

Emeryville New Construction

A design-build team that navigates Emeryville’s urban infill lots to build custom ground-up properties.

Whether you are developing an empty urban parcel or replacing an older structure, we design around what your city lot’s boundaries and zoning codes actually allow. One team handles architectural planning, municipal permits, and full-scale construction from the ground up
FAQ new constructions

Building New Properties Throughout Emeryville

Ground-up construction in Emeryville means working within a dense, urban environment. From tight property lines to strict local building codes, urban infill projects require precise planning. We evaluate your site’s access and zoning restrictions early to ensure a smooth construction cycle.

61734c2c291811cf9a305373a7e4bed3 p e

Urban Infill & Foundation Prep

Building on compact city lots requires precise foundation engineering and structural shoring. We analyze soil compaction and neighboring properties to ensure absolute stability.

Title 24 & Modern Energy Codes

We ensure your new construction property fully complies with California’s strict energy efficiency standards, integrating high-efficiency systems and green building practices.

Municipal Utility Hookups

Connecting a brand-new structure to city water, storm drains, and municipal power grids is managed seamlessly through our direct coordination with local authorities.

Urban Logistics & Material Staging

Tight streets and limited parking mean material deliveries must be heavily synchronized. We manage site logistics meticulously to avoid disrupting your neighbors.

New Construction Process

1. Initial Site Visit: 1 to 1 ½ hrs

Every new construction project begins with a clear understanding of the site and the home you want to build. We start with an on-site walkthrough to evaluate existing conditions, access, and constraints, while learning about your goals, priorities, and long-term vision. By aligning early on scope, budget, and expectations, we set the foundation for a smooth and well-coordinated build.

  • On-site walkthrough to review the property, site conditions, utilities, access, and overall feasibility
  • We provide a free preliminary construction cost range based on size, complexity, and performance goals, for example $850k – $1.1M
  • To proceed, we enter into a preconstruction agreement (PCA), covering design coordination, engineering, budgeting, and permit strategy
  • New construction planning can range from relatively simple builds to highly complex custom homes, depending on site constraints, jurisdictional requirements, and client selections
4 newconstruction walkthru

2. Design & Material Selection: 2 - 4 months

Once the overall vision is defined, the design process translates that vision into a complete set of buildable plans. For new construction, this phase establishes the home’s layout, structure, and systems from the ground up, ensuring every decision supports performance, livability, and budget control. A well-developed design is essential to an efficient and predictable build.

  • In-depth consultations to define project goals, spatial needs, performance targets, and architectural direction
  • Design considerations typically include floor plan layout, structural approach, window and door placement, lighting strategy, material selections, finishes, and exterior expression.
  • The contractor prepares a detailed and comprehensive list of all project selections and scope items for client review, forming the basis for accurate pricing, permitting, and construction execution
4 newconstruction consult

3. Permitting: 2 - 3 months

Once the design is complete, it’s time to submit the plans to the city for approval! This can take a few months, but during this time you can still keep the project moving! While many major selections will already be defined, this phase is when you begin actively selecting and confirming key materials. In new construction, early choices such as tile and finish materials are especially important, as they inform precise layout, dimensions, and coordination of fixtures, niches, and other integrated elements throughout the build.

0 BG permitting

4. Construction: 1 - 4 months

Finally, our team begins with a careful protection of your surrounding areas. Dust barriers with zipper doors, HEPA air filtration, and floor protection are some of the methods we implement to ensure your home and family are protected from the process. A dedicated project manager and construction team will carry out the work in close coordination with the homeowner, providing clear communication, organized scheduling, and day-to-day oversight to keep the project running smoothly and predictably.

new constructions phase

5. Move In

Once final city inspections are approved, we conduct a comprehensive walkthrough of the new home to confirm all systems, finishes, and details are complete and performing as intended. We then review and deliver all close-out documentation, including manuals and warranties, along with a long-term maintenance overview to help you care for and protect your home for years to come.

4 newconstructionmovein

Our New Construction Work

A look at recent Construction work from Beyond Green Construction in Oakland.

What Our Clients Say About Us

Ready to start planning your Emeryville Home?

FAQ

You Ask We Answer

Active construction for an urban infill new build typically ranges from 8 to 12 months, depending on the scale of the structure and city inspection turnarounds.

Yes, we manage the complete demolition and clearing of old structures, handling all required municipal safety permits and debris hauling.

Yes, we manage the entire permitting lifecycle directly with the City of Emeryville, from initial plan submittal to final occupancy certification.

Costs depend heavily on the scale, foundation type, and interior fixture selections. We provide a line-item estimate during preconstruction so you have complete financial clarity.

Our unified design-build framework allows architects and construction managers to collaborate daily, eliminating common gaps between the design phase and actual building execution.

    Ready to start your project?