  3. Custom ADU in Oakland

Oakland Custom ADUs

Detached, converted or tucked into the house: we design an ADU that fits your Oakland lot, like the one we just finished in Adams Point.

Oakland’s lots and homes decide what an ADU can be: a detached unit in a flat West Oakland backyard, a garage conversion off a Rockridge driveway, or a basement conversion in the Oakland Hills like the one we built on Pinehaven Rd. We design around your lot and structure and run the job from the first site visit to move-in.
IMG 7096

Building ADUs Throughout Oakland

Oakland’s lots vary block by block: narrow flat lots in West Oakland and Adams Point, wider backyards in Rockridge and Piedmont Ave, and sloped parcels in the Oakland Hills. A detached unit needs yard space and clear access, a garage conversion depends on the garage’s existing structure, and a hillside unit has to work around grading. We find out what your lot and structure can support before we design.

IMG 6760

Detached ADUs & Yard Access

Detached units need enough usable yard space plus a path wide enough for construction access and material staging. We assess setbacks, existing structures, and access during the site visit so the unit we propose is one that can actually be built and delivered.

Hillside Grading & Access

Oakland Hills lots often involve narrow, sloped driveways, retaining wall considerations, and limited staging space. We assess grading and access during the site visit so a detached or converted ADU is priced accurately up front.

Garage & Basement Conversions

For Oakland homes with existing garages or basements, we evaluate insulation, ventilation, ceiling height, and structural condition to determine whether a conversion meets code as a full ADU or is better suited as a JADU.

Utility & Meter Requirements

PG&E requires a dedicated electrical meter for a new ADU, and its timeline can outlast the city’s. On our Adams Point ADU, PG&E wanted the meter moved to the front of the house; we got the 400-amp service approved on the side after two rounds and five months. We start the utility work early so it doesn’t hold up the build.

ADU Design / Build Process

1. Free 15-Minute Call, Then a Site Visit

Every ADU starts with a vision, and this starts with a walkthrough to see what you have and understand what you want. By listening closely to your goals, vision, questions, and budget, we help you unlock the full potential of your ADU. With so many creative ways to configure compact spaces, whether it is a rental, guest suite, or a small home, it all starts with understanding how you want to live.

Step 1 – What To Expect

  • On site walkthrough to evaluate the starting point and discuss the overall goals of the project. 
  • We provide a free ballpark construction cost, which will be a significant range. 
  • This ballpark helps us understand if a client’s budget aligns with our estimated construction cost.
  • To proceed, we sign our preconstruction agreement (PCA), which includes the various services you will need to design and ultimately acquire the building permits.
walkthrough

2. Design & Material Selection: 3 - 4 weeks

Once the vision is clear, the design process brings it to life on paper. From countertops to cabinet layout to lighting, we’ll plan each detail with precision. A thorough design phase is key to staying on budget.  Also, it’s often the fun part!

  • Consultations for all project goals and design considerations. 
  • Some common design goals include careful attention around kitchen and bathroom design,  lighting options, fixture selections, as well as exterior hardscape and landscape. The contractor creates an all-inclusive list of all project selections for client review and interaction.  This single tool will be used to guide the project to the finish line.
design

3. Permitting: 2 - 3 months

Once the design is complete, it’s time to submit the plans to the city for approval. Approval time for an ADU can vary, but generally this will take around 2 – 3 months to get approved. The good news is that you can still keep the project moving! While most product selections will have already been considered, this is the time to actually start finalizing selections and shopping for items. Top on that list will often be key components for kitchen and bathroom, flooring, appliances, and fixtures.

permitting

4. Construction: 4 - 8 months

Finally, our team begins by carefully protecting your home and the surrounding areas. For attached ADUs, we install dust barriers with zipper doors and run HEPA air filtration to keep the air clean and the rest of your home undisturbed. Floor protection and other precautionary measures are also put in place. A dedicated team and project manager will carry out the work in coordination with the residents, with clear working hours established from the start.

West Berkeley backyard ADU build by Beyond Green Construction

5. Move In!

Upon passing our city final inspection, we will then do a thorough walkthrough, to ensure everything is just right. We will also provide and go over all of your new documentation, including manuals, warranties, etc., as well as provide a long term maintenance plan to help you make sure your ADU stays beautiful for years to come!

move in

Our Custom ADUs

A look at recent Custom ADUs work from Beyond Green Construction.

What Our Clients Say About Us

Ready to start planning your Oakland Home?

FAQ

Answers to the questions we hear most about ADUs in Oakland.

Most projects start with a consultation or feasibility review. We assess your Oakland lot, existing structures, access, and zoning to help determine what's possible under the City of Oakland's ADU ordinances.

In many cases, yes, especially with new state regulations that have loosened restrictions. We begin with a site and zoning analysis specific to your Oakland property, including grading and access for hillside parcels.

Yes. We manage permitting and inspections directly with the City of Oakland to keep the project compliant and moving forward smoothly.

Yes. PG&E requires a dedicated electrical meter for all newly constructed ADUs, even if one already exists on the property. New gas depends on several factors, and EBMUD does not require a new water meter for an ADU on a single-family lot.

Often, yes, depending on the garage's existing structure and condition. We evaluate insulation, ventilation, ceiling height, and structural capacity at the site visit and flag any upgrades needed to meet code.

Usually not. An ADU that meets the city's Objective Design Standards goes straight to building permits. One that doesn't, and sits in front of or beside the main house, goes through Small Project Design Review, which planning staff can approve. We design to the standards where we can, so the review doesn't add time.